Urban spaces and development areas

The rehabilitation of Üllői Road is the umbrella project connecting related investments, transport improvements and other development initiatives.

Umbrella project

The rehabilitation of Üllői Road

All the developments listed below form part of this umbrella project: the renewal of the district’s main street. Üllői Road crosses Pestszentlőrinc from east to west over a 6-kilometre stretch, which makes it the area’s main transport route and urban development axis.

About the umbrella project

Developments in preparation

Üllői Road 311–315 and 404–410

Two developments on two sections of Üllői Road; both are linked to the Our District’s Main Street concept.

Üllői Road 311–315

The aim of the development is to advance the renewal of the built environment along Üllői Road and the site’s functionality and future use.

Status: in preparation.

Üllői Road 404–410

At 404–406 Üllői Road, a residential development combining housing and retail functions is being built.

Status: construction work is under way at number 404; the implementation schedule for the entire development site has not yet been confirmed.

InnoK’s role

InnoK took part in developing the Our District’s Main Street concept and in preparing the developments, at that time as a professional workshop within Városrehabilitáció18 Nonprofit Zrt.

Housing developments

Üllői Road 323–325 and 357–361

A privately financed residential building and a municipal rental housing programme covering another section of the main street.

Üllői Road 323–325 — New World Residence

A residential building with 80 flats and a lift, adding flats of various sizes to the district’s housing stock. According to the technical plans the flats will have heat-pump heating, underfloor heating and individual metering; the development also includes parking spaces and storage units.

Status: under construction and on sale. According to the sales information the planned handover is the fourth quarter of 2026.

Üllői Road 357–361 — rental flats for young people

A rental housing programme for young people is being prepared on a municipally owned plot. According to the latest information the development aims at 36 modern rental flats and would combine affordable rents with incentives to save: with lower housing costs young people could build up their own funds towards buying a home later. The concept presented earlier assumes a five-year rental period; the detailed conditions will be set by the final programme and the call for applications.

Status: in preparation and design.

InnoK’s role

Both developments fit into the Our District’s Main Street concept, in the elaboration of which InnoK took part as a professional workshop within Városrehabilitáció18 Nonprofit Zrt.

Transport development

Extending tram 42, tram 50 and the renewal of Üllői Road

A decisive element in the renewal of the main street is the ratio between the areas used by public transport vehicles and by pedestrians, together with the surface and quality of those areas.

Extending tram 42

The planned development would extend the route of tram 42 via the Havanna and Szent Lőrinc estates to the Gloriett estate, creating a direct tram connection to Metro Line M3. Step-free stops and the renewal of the public spaces concerned would also be part of the investment. Preparation is coordinated by BKK; InnoK contributed by fitting the development idea into the Our District’s Main Street concept.

Status: in preparation.

The renewal of tram 50

The modernisation was an important transport element of the renewal of Üllői Road: step-free platforms were built, the surroundings of the stops were renewed, and the line’s entire fleet was replaced with modern low-floor CAF vehicles. The investments were prepared and carried out within the development programmes of BKK and the capital; in InnoK’s earlier preparatory work the development ideas for the tram were linked to the Our District’s Main Street concept.

Status: completed.

The renewal of Üllői Road

The Municipality of the 18th District renewed, using its own funds, the roughly 2.8-kilometre section of the city-owned Üllői Road between Szarvas csárda Square and Béke Square. During the investment, handed over in October 2023, the road surface, the kerbs, the bus stops and the pedestrian crossings were renewed, and road safety improved with the creation of central islands.

  • 30,000 m² of renewed asphalt surface;
  • 7,000 tonnes of asphalt laid;
  • 5,500 metres of renewed raised kerb;
  • 150 replaced utility shafts;
  • about 1,000 m² of new road markings;
  • 250 new road signs.

InnoK took part in developing the Our District’s Main Street concept and in coordinating the related development ideas, at that time as a professional workshop within Városrehabilitáció18 Nonprofit Zrt.

Status: completed.

Related infrastructure

Gyömrői Road, cycle network development and railway line 142

Transport developments that reach beyond the main street and improve the accessibility of the whole district.

The renewal of Gyömrői Road and the road to the airport

The planned state investment aims at modernising the carriageways and junctions, giving priority to public transport, and improving conditions for pedestrians, cyclists and noise protection.

InnoK contributed to the social grounding of the area’s development by exploring residents’ needs and organising the drafting of community proposals. The complex hybrid research of 2025 combined a questionnaire survey with 1,666 respondents and a focus group study, also covering the experiences of those living near the expressway. At the second citizens’ assembly built on the research — where the selection of the residents involved reflected the demographic composition of the district — participants formulated proposals on transport, road safety and the environment with expert support, including ones concerning the Gyömrői Road area. The research results and the documentation of the citizens’ assembly are available on the Civic Lab website.

Status: state investment in preparation.

Cycle network development

The idea formerly known under the working title “VEKOP cycle path” aimed at a cycling connection between Pestszentlőrinc and Pestszentimre and at linking up with the South Pest network, but it was not realised in its originally planned form. The current plan is to turn the affected section of the former “Bengáli” railway alignment into a cycling and green corridor, with pedestrian traffic, resting places and safe crossings.

At the fourth citizens’ assembly held on 3–4 October 2026 participants weighed up three design options and formulated development proposals. InnoK contributed to the preparation by exploring residents’ viewpoints with social research methods and by organising the drafting of community proposals.

Status: in preparation.

The development of railway line 142

The planned modernisation of the Budapest–Lajosmizse–Kecskemét railway line would improve rail access to the 18th District, especially Pestszentimre. The development ideas include the renewal and electrification of the track, step-free access at stations and stops, and better public transport and cycling connections; their aim is to create the conditions for faster, more frequent and more reliable suburban services.

InnoK supported the district’s preparatory work by fitting the development ideas into the Our District’s Main Street concept, and within it into the Our District’s Gate (Kerületünk Kapuja) sub-project.

Status: state railway development in preparation.

Development areas

Further development opportunities on Üllői Road

Areas with development potential along the main street. These are not launched investments yet: as part of the concept we are examining the opportunities they hold.

The short film linked to the Our District’s Main Street concept presents nearly sixty development opportunities along Üllői Road, each worth 2–3 million euros. The aim of the presentation is to attract the attention of property developers and investors and to initiate possible collaborations.

InnoK took part in exploring the development opportunities and fitting them into the concept, at that time as a professional workshop within Városrehabilitáció18 Nonprofit Zrt.

We welcome enquiries from property developers and investors who see an opportunity in the renewal of Üllői Road.

Playing the videos connects to YouTube (Google). We only load them if you click.